Permits
How Building Permits Work In Lincoln, NE

Nearly every project we take on in Lincoln starts with a building permit, and it’s the step homeowners tend to worry about most. Most of the friction comes from incomplete paperwork. Here’s how the process works with the city, what a new home application includes, and where we take the work off your plate.
Who Handles Permits In Lincoln
Building permits in Lincoln go through the city’s Building and Safety office, which sits within Planning and Development Services. The office is at 555 S. 10th Street, Suite 203, and most applications are filed online through the city’s Citizen Access portal. That’s also where fees get paid and inspections get scheduled.
The city’s own guidance lists the kinds of work that need a building permit, and it covers a lot: new homes, additions, garages, decks, sheds, finished basements, fences over seven feet, and adding or removing walls. All of it has to meet the Lincoln Residential Code and the zoning ordinance. If you’re unsure whether your project needs one, assume it does and ask. A permit costs far less than tearing out work that was built without one.
What A New Home Application Includes
A small shed may only need a site plan showing where it sits on the lot. A new house needs full construction drawings, and the city’s rule of thumb is a good one: the plans should have enough detail for another person to do the work. In practice that means floor plans, elevations, structural details, and a site plan that places the house on the lot with its distances to the property lines.
A new home also carries a stack of companion forms. Lincoln’s checklist for residential contractors includes an energy code certification, a curb cut and sidewalk permit, an impact determination form, a water supply form, a sewer tap permit, and an erosion control notice of intent. Some lots also need a floodplain permit, and a teardown needs a demolition permit. The address itself has to be valid before anything is filed, and the city points to the County Assessor and its own GIS maps to confirm it.
Permit and impact fees are set by the city and change over time, so we confirm them for your address when we put your budget together. Our planning numbers carry a default $30,000 allowance for soft costs like these, along with closing and contingency.
Plan Review And Corrections
Once the application is in, the city reviews it, and the reviewer may come back asking for revisions to the drawings or the attached forms. That’s a normal part of the process. Comments usually ask for a missing detail, a clearer note, or a calculation, and the permit moves again once they’re answered.
This is where most delays come from. A package that goes in with gaps gets comments on every gap, and each round of back and forth adds time. We prepare our documents with plan review in mind, submit complete packages, and answer comments quickly, because the schedule for your whole build waits on this step.
Inspections During Construction
The city won’t schedule an inspection until the permit has been issued, which is one more reason the review stage matters. After that, inspections are booked through Citizen Access or the city’s 24-hour inspection line. On a new home, inspectors visit at set points in the build, typically before work gets covered up, and anything that doesn’t pass has to be corrected and inspected again.
On our projects, Colten Roth, our licensed contractor, manages that sequence along with the subcontractors, the schedule, and the budget. You won’t be calling in inspections or waiting at the site for the inspector. We keep you posted on what passed and what comes next.
Why We Handle The Permit Ourselves
Because we’re a design-build firm, the people who draw your house are the same people who submit it and build it. When a plan reviewer asks a question, Alec Calzada, who led the design, can answer it directly, and the answer goes straight into the drawings the crew will build from. That keeps the permit set and the job site in agreement from start to finish.
If you’re thinking about a backyard home, our ADU Checker shows whether your Lincoln lot qualifies before anything gets drawn. For a new home, an addition, or a remodel, the next step is a one-hour design consultation by video or phone for $105. We’ll look at your lot and your plans and tell you which permits the project will need. You can book it here.

